Showing posts with label craps table construction. Show all posts
Showing posts with label craps table construction. Show all posts
Tuesday, August 13, 2013
Throwing Station
This is a picture of my throwing station. It is used to improve your throwing skills. I kept it compact so it is more portable and easier to store when not in use.
Labels:
craps,
craps table construction,
plans,
throwing station
Sunday, August 23, 2009
Attaching the table surface pieces together
I have been research ways to attach the pieces of the table together. Right now the best method seems to be using a threaded insert on one pieces and then running a bolt through from the other piece. This will allow me to assemble and dis-assemble the table if I need to move it. One day I will post some construction photos.
Sunday, August 16, 2009
Craps Table Construction - Table Surface
The table surface of the craps table has been cut out. The next step is to determine how to assemble the surface so that it can be quickly disassembled in the event it needs to be moved. Any ideas?
Thursday, August 13, 2009
Craps Table Construction Update
Some of the components have been traced onto the plywood. The plan is to start cutting out the pieces and documenting how to assemble the craps table. I was reviewing the data gathered during the July Vegas run and discovered that I have maybe played in 75% of the casinos on the strip. i have a goal of playing craps in all of them in one year, so I guess I will need to go back out there......
Subscribe to:
Posts (Atom)